Talk to us
03 / Post-saleAurora Solar

After thesignature

Permit documents in under a minute, stamped plan sets when you need them, racking designed to spec, and a drone check that catches discrepancies before a single part is ordered.

From signature to supplier

Selling the system is half the job. Building exactly what you sold is the other half.

After the contract, every delay costs money: permits waiting on documents, documents waiting on revisions, crews waiting on parts.

Aurora Solar keeps the sold design moving, into permit documents, into a racking design and bill of materials, and into supplier ordering, with a check against the real roof on the way.

The pace of post-sale

Measured in seconds and hours

Figures as reported by Aurora Solar.

<60sInstant plan sets

Permit documentation generated from the design.

24 to 48hPlan set service

Authority-ready documents with engineering stamps.

95%First-time approval

Reported rate for the plan set service.

An instant plan set and the racking bill of materials, both generated from the sold design.

Permitting

Plan sets, two ways

01 / Instant

Instant plan sets in under 60 seconds

Generate permit documentation straight from the sold design in under 60 seconds.

The design that closed the deal becomes the design submitted for permit, with no redraw in between and no chance for the two to drift apart.

  • Under 60 seconds
  • From the sold design
  • No redraw
  • Ready to submit

02 / Service

Stamped plan sets in 24 to 48 hours

Where instant plan sets are not available, the plan set service delivers permitting-authority-ready documents with engineering stamps in 24 to 48 hours.

Aurora Solar reports a 95 percent first-time approval rate for the service, which means fewer resubmissions and fewer weeks lost to corrections.

  • Engineering stamps
  • Authority-ready
  • 24 to 48 hours
  • 95% reported first-time approval

Racking and materials

Designed to spec, ordered from the design

01 / Racking

Your racking system, to spec

Racking integrations let installers design the specific racking system they use, to its specification, inside the platform.

The mounting plan reflects real components rather than a generic placeholder, so what is drawn is what gets installed.

02 / BOM

An automatic bill of materials

Once the racking is designed, the bill of materials is generated automatically from the design.

Rails, attachments, clamps and the rest are counted from the layout itself, not estimated from the system size.

03 / Ordering

Straight to supplier ordering

The bill of materials flows on to supplier ordering, closing the loop from design to the parts that arrive on site.

Fewer manual counts, fewer transcription errors, fewer short shipments discovered on install day.

Check the roof before the truck rolls

After the sale, merge a new drone capture against the sold design. Aurora Solar surfaces discrepancies before materials are ordered.

An obstruction that was not modelled, a plane that measures differently: these are cheap to fix as a design revision and expensive to discover with a crew on the roof.

The same drone data can also create roof models before the sale, so one capture workflow serves both ends of the project.

Drone data in design

The sequence

From signature to order

Each step uses the record the last one created.

  1. Contract signed

    Generated from the final proposal and signed in the platform.

  2. Roof verified

    A new drone capture is merged against the sold design.

  3. Permit documents

    An instant plan set, or a stamped set in 24 to 48 hours.

  4. Racking designed

    Your racking system, designed to its specification.

  5. Parts ordered

    The bill of materials flows to supplier ordering.

Questions

Post-sale, answered

Permitting, racking and verification, in plain terms.

How fast are instant plan sets?

Instant plan sets generate permit documentation from the design in under 60 seconds.

What if instant plan sets are not available for a project?

The plan set service delivers permitting-authority-ready documents with engineering stamps in 24 to 48 hours.

What is the approval rate for the plan set service?

Aurora Solar reports a 95 percent first-time approval rate for plan sets delivered by the service.

Can we design the racking system we actually use?

Yes. Racking integrations let you design your specific racking system to spec, then generate the bill of materials automatically.

How does the bill of materials reach our supplier?

It is generated from the design and flows on to supplier ordering, so parts are ordered from the same record the crew will build from.

How does the post-sale drone check work?

Capture the roof again after the sale and merge the new data against the sold design. Discrepancies are surfaced before materials are ordered.